Corridor Cold

Corridor Cold

Corridor cold confined with air overpressure.

A Storage Rack

A Storage Rack

This is one of the storage racks in the front.

Visitors in corridor cold

Visitors in corridor cold

Visit advisory team in cold aisle. Specifically located in front of storage cabin

NOC

NOC

Operations control center. All systems are controlled

Battery room A

Battery room A

One of the battery rooms, sized to the IT load current.

Advisory group visit

Advisory group visit

chillers

chillers

Two of the chillers that cool by water the datacenter

generator

generator

It is one of the groups that give back to the input connections. In free space are fuel tanks

Group

Group

Room Electric switchboard panel A

Room Electric switchboard panel A

In this room the power of roof bars is passed to individual rush entering room.

Room Electric switchboard panel A

Room Electric switchboard panel A

Electric switchboard panel

Electric switchboard panel

More Electric switchboard panel

More Electric switchboard panel

Many more Electric switchboard panel

Many more Electric switchboard panel

Data Rejiband

Data Rejiband

Corridor power zone

Corridor power zone

See the power input bars on rooftops

Power bars

Power bars

Electricity enters for these bars.

UPSs

UPSs

Group

Group

Battery Room A

Battery Room A

Fighting equipment Batteries

Fighting equipment Batteries

The batteries used extinguishing gas while the other facilities do water mist.

Extinction Batteries

Extinction Batteries

The batteries used extinguishing gas while the other facilities do water mist.

DSC09916.JPG

DSC09916.JPG

UPSs

UPSs

Water shut off valve

Water shut off valve

Shutoff valve water supply for emergencies.

UPSs

UPSs

Transformer room

Transformer room

CRAC room

CRAC room

The cold room is provided by these machines that absorbed by the upper ambient air and, after cooling, is injected under pressure through the raised floor.

 Access

Access

Access to the building is restricted.

Connections of the nodes

Connections of the nodes

It looks like it connects the Infiniband and below the three networks 10Gb Ethernet

Cabin back

Cabin back

This is the back of storage arrays, with redundant fiber connectors and 10Gb Ethernet

Disk shelves back

Disk shelves back

PREVIOUS: Rack ready for this room

PREVIOUS: Rack ready for this room

This rack is already assembled and ready for room.

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Mounting cabinets in room

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Example cabinet

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Front platform nodes with shared disk

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Fiber connectors

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Cabinet detail

PREVIOUS: Assembly process

PREVIOUS: Assembly process

extracted node platform

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Removed node

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Mountig phase

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Networks cabinet. Redundant.

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Rack Detail

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Fiber cabling process

PREVIOUS: Assembly process

PREVIOUS: Assembly process

PREVIOUS: Assembly process

PREVIOUS: Assembly process

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Rack en proceso de ensamblado. Véase que son armarios de 70cm y no de 60cm para poder distribuir el cableado mejor.

PREVIOUS: Assembly process

PREVIOUS: Assembly process

Galery.